Here are the current fees for the highway services we offer.

Fees for highway services
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Third party signing, including tourism signposting

(non-refundable application fee)
£333£345

Third party signing, including tourism

a) site assessment cost (payable in advance)

b) sign design cost per sign (payable in advance)

£258 + £121 per sign£267 + £125 per sign
Construction costs

(payable in advance)
Actual cost of constructionActual cost of construction

Stopping up orders for third parties initial assessment fee
(non-refundable)

£500£500
Stopping up orders for third parties substantive stage/stage 2Actual cost of stageActual cost of stage
Disposal of our land historically kept for 'highway purposes'Land value and actual costs (site specific) based on advice and services from our propertyLand value and actual costs (site specific) based on advice and services from our property
Charges relating to damage to highway infrastructure/ equipment

Claims against third parties for damage to highway assets

Recovery of costs of making safe dangerous land or retaining walls
Full cost recovering, including staff timeFull cost recovering, including staff time
Street-lighting application to attach equipment to street lighting assets.£134£139
Street- lighting repeat application fee£39£41
Street-lighting fitting shade to LED lantern£123£128
Street-lighting onsite investigation by engineer to accommodate customer request£63£66
Request for temporary closure of zebra crossings - all charges subject to VAT - application fee£43 - non-refundable

£295 - office hours
£358 - out of hours
£45 - non-refundable

£306 - office hours
£371 - out of hours
Request for temporary closure of zebra crossings - all charges subject to VAT - abortive visit£79 - office hours
£96 - out of hours
£82- office hours
£100 - out of hours
Request for temporary closure of zebra crossings - all charges subject to VAT - emergency if notified with less than 1 weeks’ notice£131.22 - additional charge£136 - additional charge
Third party traffic regulations ordersStage 1: £1,800
Stage 2: £1,200
Stage 1: £1,875
Stage 2: £1,250
Traffic Regulation Order Joint Transportation Board Report£685£710
Archived traffic count data£220£228
New traffic countActual costActual cost
Third party traffic scheme advice and designActual costActual cost
(by Traffic Regulation Order) administration fee for third party (excludes costs of Order)£910 including payment admin fee and advert£1,110 including payment admin fee and advert
Emergency road closures (by notice) administration fee for third parties, if justified in exceptional circumstances£660£860
For amendments made after the TTRO has been approved and advertised will be subject to an amendment fee for each amendment£350£365
Materials stored on the highway for 7 calendar days£47 per week£49 per week
Hoardings placed on the highway for 7 calendar days£71 per week£73 per week
Permit for scaffolding placed on the highway for 7 calendar days£48 per week£50 per week
Permit for skip on the highway for 7 calendar days£41 per week£43 per week
Mobile Elevated Work Platform or crane oversailing and / or operating upon the highway for 7 calendar days£217 per week£225 per week
Site inspection to assess safety and condition if deemed necessary before and after placing of scaffolding, hoarding, etc. on the highway£72£75
Failure to comply with terms of a skip licence or failure to license (standard defect fee set by regulation)£120£120
Application to attach equipment to highway assets (not including street lights) for a 12-month period (additional costs apply for signs attached to street lighting columns)£350£350
Investigatory Coring (S72 NRSWA)-£195 plus any associated Traffic management costs
Travel plan monitoringFees are determined according to the type and scale of the proposed developmentFees are determined according to the type and scale of the proposed development
Pre-application adviceFees are determined according to the type and scale of the proposed developmentFees are determined according to the type and scale of the proposed development
Section 106 Agreements for Highway ContributionsFees charged according to time spent by individual highway officers in determining agreementFees charged according to time spent by individual highway officers in determining agreement
Sewer connection inspection fee for each 200m in length for Category A, B and C Inspections£150£150
S50 Apparatus in the Highway

i. £122.50 Administration fee

ii. £127.50 Capitalised fee (this is a single payment in lieu of annual licence renewal charges)

iii. £150 Inspection fee (For each 200m in Length for Category A, B and C Inspections)

£400 total

£695

Fees for footway vehicle crossover applications
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Over the footway - single dwelling
(Inspection fee for site checks in line with Road and Street Works Act)
£212£222
Technical fee for application, investigation and highway inspection£249£258
Additional site specific investigation for street lighting, drainage, and soft landscape issues (single private dwelling)£72£74
Investigate and respond to a written or email enquiry of a freehold property sale regarding legitimacy of an existing vehicle crossing, per site£70£73
Properties on site: 2 to 5£309 per property

Minimum:£762
Maximum: £1,521
£350 per property

Minimum:£850
Maximum: £1,600
Properties on site: 6 to 25Minimum:£1,521
Maximum: £3,785
£350 per property

Minimum:£1,600
Maximum: £4,375
Technical fee for application, investigation and ordering the work£190£197
Commercial (shops, businesses,  access car parks)-£1255 (minimum) Access only - cost £350 per space. Anything over 50 spaces S278 required
Developer temporary crossing (one-off fee)£843£900
Additional site specific investigation for street lighting, drainage, and soft landscape issues£84£90
Claims against third parties for damage to highway assetsFull cost recovery
(including staff time)
Full cost recovery
(including staff time)
Recovery of costs of making safe dangerous land or retaining wallsFull cost recovery
(including staff time)
Full cost recovery
(including staff time)
Charges for consequential damage repairs as a result of third party asset (utilities or private) failures within the highwayFull cost recovery
(including staff time)
Full cost recovery
(including staff time)
Street-lighting - application to attach equipment to street lighting assets£134£139
Street-lighting - application to attach equipment to street lighting assets repeat application£39£39

Prices for the data sheet print out; at Microprocessor Optimised Vehicle Actuation (MOVA) sites the MOVA data set will also be included.

(Costs inclusive of VAT)

Fees for traffic signal supply of technical data
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Number of sites: 1£244£253
Number of sites: 2£350£362
Number of sites: 3£455£471
Number of sites: 4£561£581
Number of sites: 5£665£688
Number of sites: 6£769£796
Number of sites: 7£873£903
Number of sites: 8+Extra £103 per siteExtra £107 per site
Number of sites: 50+To be agreed on an individual basisTo be agreed on an individual basis
Detailed descriptions of how the site operates are available at an extra cost£210£217
Traffic signal technical approval (before inclusion in an S106/S278 Agreement), testing and commissioningTo be quoted on an individual basis appropriate to the size/complexity of the schemeTo be quoted on an individual basis appropriate to the size/complexity of the scheme
Traffic signal design, technical approval (before inclusion in an S106/S278 Agreement), testing and commissioningTo be quoted on an individual basis appropriate to the size/complexity of the schemeTo be quoted on an individual basis appropriate to the size/complexity of the scheme
Temporary switch off of existing permanent traffic signalsTo be quoted on an individual basis defined by the asset, date, time and prior notice givenTo be quoted on an individual basis defined by the asset, date, time and prior notice given

Fees for highway developer requests
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Section 38 supervision fee for new estate roads10% of bond
(advance: £5,000 excludes legal fees)
10% of bond
(advance: £5,000 excludes legal fees)
Section 278 fixed fee for transportation advice to developer

(Bond value £0 to £249,999)
£7,995£8,234
Section 278 fixed fee for transportation advice to developer

(Bond value £250,000 to £999,999)
£15,912£16,469
Section 278 fixed fee for transportation advice to developer

(Bond value £1 million and above)
£23,867£24,703
Section 278 fee for project management, design checks and site inspections for imports to existing highways (plus legal fees)

(Bond value up to £499,999)
10% of bond10% of bond
Section 278 fee for project management, design checks and site inspections for imports to existing highways (plus legal fees)

(Bond value £500,000 and above)
10% of first £500,000 + 3% of balance10% of first £500,000 + 3% of balance
Commuted sums: Section 38 of the Highways Act 1980, subsection (6) for maintaining any highway, road or bridge covered by an agreementCalculated on a site by site basis in accordance with Commuted Sum Policy 2003 on construction materials that are significantly more than normally required (covers sustainable urban drain systems and drainage, special surfaces, landscaping, street lighting, traffic signals, variable message signs and other items)Calculated on a site by site basis in accordance with Commuted Sum Policy 2003 on construction materials that are significantly more than normally required (covers sustainable urban drain systems and drainage, special surfaces, landscaping, street lighting, traffic signals, variable message signs and other items)

Fees for highway structure and geotechnics
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Technical approval of highway structuresActual costActual cost
Technical approval of special geotechnical measures (reinforced/strengthened soil or fill)Actual costActual cost
Commuted sums: for maintaining any highway structure or geotechnical asset to be adoptedCalculated individually for each asset in accordance with Adept guidelines (2018)Calculated individually for each asset in accordance with Adept guidelines (2018)
Technical Approval of S177 LicensesActual costActual cost

Fees for access to technical information
Request typeSize of coloured plan Fees for 2024 to 2025 Fees for 2025 to 2026
A letter and a coloured plan which shows the considered extent of the publicly maintainable highway (up to 4 questions per site)A4£150£155
A letter and a coloured plan (at 1:1,250 scale) which shows the considered extent of the publicly maintainable highway (up to 4 questions per site)A3£200£207
A letter and a coloured plan (at 1:1,250 scale) which shows the considered extent of the publicly maintainable highway (up to 4 questions per site)A2£330£341
A letter and a coloured plan (at 1:1,250 scale) which shows the considered extent of the publicly maintainable highway (up to 4 questions per site)A1£500£517
A letter and a coloured plan (at 1:1,250 scale) which shows the considered extent of the publicly maintainable highway (up to 4 questions per site)A0£850£880

Response to a written or email enquiry, readoption of roads and details of highway schemes within vicinity of a property:

  • £27 plus VAT (2024 to 2025 fees)
  • £28 plus VAT (2025 to 2026 fees)

Fees for approved highway scheme requests
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Information supplied (for example a board report)£64£67
Copy of complete scheme drawings per plan supplied£58£60
Copy of extract from scheme drawings per plan supplied (max: A3)£44£45
Copy of Advanced Payment Code Notice (Highways Act 1980 Section 219-225)£64£67

Fees for approved strategies and policy requests
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Copies of cycling, walking and bus policies, maintenance plans, pavement design guides, etc for highway consultants£50£52
Photocopies of highways and transport documents or files for information (charge is for materials and equipment; no charge for staff time)

(Past 3 years conflated in this increase)
22p per A4 copy
28p per A3 copy
22p per A4 copy
28p per A3 copy
Extra cost for colour copies£1.10 per colour copy£1.10 per colour copy

Quotes for larger areas will be provided upon receipt.

Fees for crash database requests
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
3 year history of crashes at a location£190.80 including VAT£198 including VAT
5 year history of crashes at a location£342 including VAT£354 including VAT

Fees for training services
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Bikeability cycle training

Charges in this case are set for academic rather than financial year, from September
£15 per child in term time courses

£20 per child in half term/school holidays
£15 per child in term time courses

£20 per child in half term/school holidays
Adult ‘Learn to Ride’ course (2 hours basic skills)£10£10
Adult confident road cycling (2.5 hours; broader risk assessment and ability analysis required, so more instructor preparation time)£15£15
Cycle and helmet hire for above 2 courses£5 per cycle per session

Helmet offered free of charge as requested
£5 per cycle per session

Helmet offered free of charge as requested
Advanced cycling£35£30
Minibus driver training£130£130
Minibus driver reassessment£65£75
Theatres in education - charge to school for performance – primary or secondary per performance, but may be waived50% of cost
(no change proposed)
50% of cost
(no change proposed)
Speed Awareness course (digital)£92£98
What's Driving Us course (digital)£92£98
National Motorway Speed Awareness course (digital)£92£98
Safe and Considerate Driving (SCD) (digital and practical)£194£194
National Rider Risk Awareness Course (NRRAC)£92£92
Street lighting - application to attach equipment to street lighting assets£134 (repeat application fee£39)£134 (repeat application fee£39)

Fees for drainage requests
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Supervision of drainage asset relocation carried out by third party (minimum £1000)10% of the estimated cost of works10% of the estimated cost of works
A letter and A4 coloured plan showing the available information held on drainage asset location (including site history up to 5 years which may include CCTV reports by USRN)£121£125
CCTV surveyAt cost plus staff timeAt cost plus staff time

Fees for accessing the Kent Traffic Model
Request type Fees for 2024 to 2025 Fees for 2025 to 2026
Corridor or individual junction access fee to Kent Traffic Model£600£625
Local town or area access fee to Kent Traffic Model£1,800£1,875
Countywide area access fee to Kent Traffic Model£2,400£2,500
Modelling fee agreed following inception meetingCalculated on a site-by-site basis as per Transport Modelling Access ProcessCalculated on a site-by-site basis as per Transport Modelling Access Process

Email transport.modelling@kent.gov.uk to discuss these fees.

The fees for different landscape requests across the next two years.
Request type Fees for 2024 to 2025 Fees for 2025 to 2026

Charges for damage or removal of highway tree assets

We value trees using the Capital Asset Valuation for Amenity Trees (CAVAT)

CAVAT takes the replacement value approach, extrapolating from known planting costs and adjusting for a series of relevant factors including:

  • diameter of tree at 1.5m above ground level
  • CTI factor
  • CAVAT functional factor
  • life expectancy of the tree

We may pursue for damages as the actual (uncapped) CAVAT value of the tree. The current maximum CAVAT value is £236,000 per tree

10% of the estimated cost of works10% of the estimated cost of works

Loss of a highway tree asset to facilitate a single/ joint dwelling light vehicle crossover application may be considered where an assessment of the tree’s condition and remaining life expectancy is deemed limited by our Tree Officer. Each tree will be assessed on a case by case basis.

The cost of 2 replacement trees and 3 years associated aftercare will be sought from the applicant.

Ranging from £1,099 up to £1,844 for 2 replacement trees depending on site type (requirement for civils involvement)Ranging from £1,203 up to £2,019 for 2 replacement trees depending on site type (requirement for civils involvement)
Emergency clearance of private trees and vegetation that have fallen on the highway, are obstructing the highway or present a risk to highway users either as a result of a weather event or following an inspection.Full cost recovery (including staff time)Full cost recovery (including staff time)

Charges for damage or removal of highway soft landscape assets including Hedge, Shrubs and Grass verges.

Loss of soft landscape assets is calculated using the cost to replace combined with the prevailing biodiversity value as assessed by a our Landscape Officer.

-Full cost of reinstatement using similar size stock plus biodiversity value (Including staff time)

Loss of a highway soft landscape asset including hedges, shrubs and grass verges to facilitate a single/ joint dwelling light vehicle crossover application are considered where an assessment of the assets condition, biodiversity value and quality has been reviewed by a our Landscape Officer.

Each application will be assessed on a case by case basis.

-Full cost of reinstatement using similar size stock plus biodiversity value (Including staff time)